Skip to main content

 

Midrise Construction Concerns - BOABC.pdf

If content does not load you may need to update your version of Adobe Flash Player. Install the Flash Player »

0 Comments

Would you like to comment?

You must be a member. Sign In if you are already a member.

 

Are you sure you want to steal this reservation?

  • 188 views
  • 1 version
  • 0 comments
  • 0 followers
     
Description:

Mid-rise (6 storey) combustible construction may be here to stay but it must only be built in communities after a review of the risks and fire department capablities. This presentation identifies several mitigative measures to consider both pre and post construction.

Avg. Rating:
Post Date:
November 28, 2011
Posted By:
Sean Tracey
Size:
4.3 MB
Versions:
v.1
Type:
Adobe Acrobat

Viewed 188 times